Our Fleet
Sea Lift1

Length18 m
Beam9.3 m
Deck Jacking Capacity80 T
Max operating depth22 m
Sea Lift2

Length18 m
Beam9.5 m
Deck Jacking Capacity80 T
Max operating depth22 m
Sea Lift2A

Length18 m
Beam12.4 m
Deck Jacking Capacity60 T
Max operating depth22 m
Sea Lift3

Length17.2 m
Beam12.9m
Deck Jacking Capacity30 T
Max operating depth20m
Sea Lift6

Length19.81 m
Beam14.5 m
Deck Jacking Capacity80 T
Max operating depth24 m
Sea Lift10

Length13.5 m
Beam7.24 m
Deck Jacking Capacity10 T
Max operating depth12 m
Sea Lift 11

Length13.5m
Beam8.2m
Deck Jacking Capacity20T
Max operating depth15m
Projects
Our Fleet locations
Interact with the project map to find out more information on key projects completed
live Projects
0
projects completed
0

PROJECT NEWS
Borehole testing in Lake Orr under the Cassowary Drive Bridge in Burleigh Heads.
ABH vessels have been engaged by GHD to assist in completing ongoing water quality and sediment monitoring in Sydney Harbour, Botany Bay and Port Kembla
Douglas Partners engaged ABH floating spudded barge to complete a geotech investigation to develop a proposed new footbridge
Sea Lift 3 near Balls Head Reserve
Sealift 3 now with new 36m legs starting onsite near Balls Head Reserve, NSW with Rockwell and Tetra Tech
Sea Lift 10 operating at Hunter River
Sea Lift 10 Currently operating in the Hunter River on our first project with CMW.
Sea Lift 1 commenced on the Kamay Ferry Wharves
ABH Sealift 1 commenced on the Kamay Ferry Wharves in July. Chartered by Polaris / Principal – McConnell Dowell.
SL10 assembled in the Hunter River
Sealift 10, assembled and ready to be moved upstream in the Hunter River to work for CMW / John Holland on an overwater geotech campaign for 8-10 weeks
Grab Sampling / Water Monitoring
ABH completes another successful campaign using Sea Transfer 2 with GHD in Sydney Harbour, Botany and Port Kembla.
Sea Lift 6 – Post Cyclone Isla
Sealift 6 was disassembled and dry stored in preparation for cyclone Isla and reassembled last week ready for work – it has been a busy fortnight for the ABH WA crew.
Introducing our newest Jack Up Barge to the ABH fleet – Sealift 11. First project since being commissioned working for Tetra Tech in Sydney Harbour.
Sea Lift 3 assisting Abergeldie in the construction of the new Alfred Street Pedestrian Bridge.
Port Hedland – Western Australia
Sealift 6 back working at Port Hedland after being packed up and dry stored before cyclone Isla
Fort Denison – Sydney Harbour NSW
Australian Barge Hire in conjunction with Hagstrom Drilling have carried out geotechnical investigation for the Fort Denison Ferry Berth in Sydney Harbour
Kamay Ferry Wharves – Sydney NSW
Australian Barge Hire is working with Rockwell Drilling to carry out geotechnical investigations on the seabed to reinstate ferry wharves at La Perouse and Kurnell. See St George & Sutherland Shire Leader news report
Glencore exploration of seabed for proposed off loading facility – SJ Drilling and Australian Barge hire carrying out geotechnical investigations.
Rio Tinto Refurbishment of Mission River Bridge – Australian Barge Hire and Kaefer Integrated Services have been working together over the last 2 dry seasons to safely carry out blasting and painting refurbishment works
Hawkesbury River Rail Bridge – New South Wales
Australian Barge Hire has provided Above Scaffolding assisting Laing O’Rourke / John Holland with a safety boat / assist vessel during Sydney Trains track possession maintenance – the last being the long weekend in October 20.
Coffs Harbour – New South Wales
Regional Geotech Solutions is carrying out geotechnical investigation from ABH jack up Barge – Sea Lift 10 for the extension and widening of the Coffs Harbour Boat Ramp.