
Fort Denison – Sydney Harbour NSW
Australian Barge Hire in conjunction with Hagstrom Drilling have carried out geotechnical investigation for the Fort Denison Ferry Berth in Sydney Harbour
Australian Barge Hire in conjunction with Hagstrom Drilling have carried out geotechnical investigation for the Fort Denison Ferry Berth in Sydney Harbour
Australian Barge Hire is working with Rockwell Drilling to carry out geotechnical investigations on the seabed to reinstate ferry wharves at La Perouse and Kurnell.
Glencore exploration of seabed for proposed off loading facility – SJ Drilling and Australian Barge hire carrying out geotechnical investigations.
Rio Tinto Refurbishment of Mission River Bridge – Australian Barge Hire and Kaefer Integrated Services have been working together over the last 2 dry seasons
Australian Barge Hire has provided Above Scaffolding assisting Laing O’Rourke / John Holland with a safety boat / assist vessel during Sydney Trains track possession
Regional Geotech Solutions is carrying out geotechnical investigation from ABH jack up Barge – Sea Lift 10 for the extension and widening of the Coffs
Select your desired option below to share a direct link to this page